|
|
|
|
| LEADER |
00000cam a2200000 7i4500 |
| 001 |
0000023457 |
| 005 |
20070625.0 |
| 008 |
070625s2007 |
| 100 |
1 |
0 |
|a MOHD Taha Kadir Sulaiman
|
| 245 |
1 |
0 |
|a Detailed Design Project of Fatty alcohol Production Plant 100,000 Metric Tonnes Per Year
|c Mohd Taha Kadir Sulaiman
|
| 260 |
0 |
0 |
|a Serdang :
|b Universiti Putra Malaysia ,
|c 2006/2007
|
| 300 |
|
|
|a xi,136p., :
|b ill., ;
|c 29cm.
|
| 502 |
0 |
0 |
|a Thesis (Bachelor of engineering)-Universiti Putra Malaysia, 2006/2007
|
| 610 |
2 |
0 |
|a Universiti Putra Malaysia
|x Dissertation
|
| 999 |
|
|
|a D000008476
|b THESIS AND DISSERTATIONS
|c REFERENCE
|e Default branch
|