Wan Mohd Nazeer bin Wan Ramli. (2014). Is the contractor still entitled to extension of time without giving notice of delay? A united kingdom and Malaysian construction industry`s perspective [Thesis]. University of Strathclyde Glasgow.
Chicago Style (17th ed.) CitationWan Mohd Nazeer bin Wan Ramli. Is the Contractor Still Entitled to Extension of Time Without Giving Notice of Delay? A United Kingdom and Malaysian Construction Industry`s Perspective [Thesis]. Selangor: University of Strathclyde Glasgow, 2014.
MLA (9th ed.) CitationWan Mohd Nazeer bin Wan Ramli. Is the Contractor Still Entitled to Extension of Time Without Giving Notice of Delay? A United Kingdom and Malaysian Construction Industry`s Perspective [Thesis]. University of Strathclyde Glasgow, 2014.
Warning: These citations may not always be 100% accurate.