Is the contractor still entitled to extension of time without giving notice of delay? A united kingdom and Malaysian construction industry`s perspective [Thesis]

Bibliographic Details
Main Author: Wan Mohd Nazeer bin Wan Ramli
Format: Thesis Book
Published: Selangor : University of Strathclyde Glasgow , 2014
Subjects:
Online Access:http://ilmu.jpa.gov.my/document/0000033090.pdf

MARC

LEADER 00000cam a2200000 7i4500
001 0000033090
005 20181113.0
008 181113s2014
040 |a JPA 
090 0 0 |a D14140   |b WAN 
100 1 0 |a Wan Mohd Nazeer bin Wan Ramli 
245 1 0 |a Is the contractor still entitled to extension of time without giving notice of delay? A united kingdom and Malaysian construction industry`s perspective [Thesis]   |c Wan Mohd Nazeer bin Wan Ramli 
260 0 0 |a Selangor :   |b University of Strathclyde Glasgow ,   |c 2014 
300 |a vii,49 pages ;   |c 30cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
500 0 0 |a Thesis 
502 0 0 |a LLM Construction Law 
610 1 0 |a University of Strathclyde Glasgow   |x Dissertations 
650 0 0 |x Dissertation, thesis, etc 
856 |u http://ilmu.jpa.gov.my/document/0000033090.pdf 
999 |a D000014140   |b THESIS AND DISSERTATIONS   |c REFERENCE   |e Default branch